Can someone clarify for me. return includes a sch A can't be efiled until 02/14. I thought I could do return, print out, have client pick up, take their copy, sign 8879 and I would then transmit when it is ok to send. (02/14)
But I now notice the 8879 is not printing the DCN correct number. So what is everyone doing. waiting to the 14th to have the 8879 printed and signed?
thanks